Measurement form: Situation 5 Your Name (required) Company Telephone (required) City (required) Your Email (required) Maximum pallet width in MM (required) Maximum pallet heigth in MM (required) Maximum pallet depth in MM (required) Available opening width in MM (required) Available opening height in MM (required) Available depth in MM (required) Available height behind the opening and rear of the door in MM (required) Distance between the front of the wall in MM (required) In which direction should the goods be transported?(required) Comments Comments, for example are there any constructions like tubes or wiring?